Witbrookprojects

Supply Chain Operations Consulting

Active Verified

Member Since

March 2024

Projects Completed

12

Client Rating

4.8 / 5.0

Quick Actions

Recent Project Activity

Real-time milestones from our ongoing consulting engagements.

Flow Audit — Phase 1 Complete 12 Oct 2025

Mapped 14 material handling nodes at a 280k sq ft DC in Gauteng. Identified 3 primary bottlenecks in the putaway-to-picking loop.

Racking Layout — Design Approval 28 Sep 2025

Selective + push-back hybrid layout approved for a cold storage facility. Estimated 22% increase in pallet positions without expanding footprint.

Scheduling Framework — Go-Live 15 Sep 2025

Wave planning and dock appointment system went live at a 3-shift assembly plant. Early data shows 18% reduction in overtime during first two weeks.

Material Handling Path — Audit Started 2 Sep 2025

Began time-motion study across 6 forklift routes. Initial observations indicate 40% of travel distance is avoidable with re‑sequenced drop zones.

Client Onboarding — New Engagement 18 Aug 2025

Kick-off meeting completed with a regional FMCG distributor. Scope includes full logistics audit and racking redesign for their Durban DC.

Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.