Supply Chain Operations Consulting
Member Since
March 2024
Projects Completed
12
Client Rating
4.8 / 5.0
Real-time milestones from our ongoing consulting engagements.
Mapped 14 material handling nodes at a 280k sq ft DC in Gauteng. Identified 3 primary bottlenecks in the putaway-to-picking loop.
Selective + push-back hybrid layout approved for a cold storage facility. Estimated 22% increase in pallet positions without expanding footprint.
Wave planning and dock appointment system went live at a 3-shift assembly plant. Early data shows 18% reduction in overtime during first two weeks.
Began time-motion study across 6 forklift routes. Initial observations indicate 40% of travel distance is avoidable with re‑sequenced drop zones.
Kick-off meeting completed with a regional FMCG distributor. Scope includes full logistics audit and racking redesign for their Durban DC.